• <sup id="yyy8y"><cite id="yyy8y"></cite></sup>
    <tr id="yyy8y"></tr>
    
    
  • <nav id="yyy8y"><cite id="yyy8y"></cite></nav>
    <nav id="yyy8y"><cite id="yyy8y"></cite></nav>
    <small id="yyy8y"><menu id="yyy8y"></menu></small>
    在线国产欧美,婷婷色在线视频极品视觉盛宴,久久香蕉国产线看观看导航,国产激情婷婷丁香五月天,国产AⅤ天堂亚洲国产AV,a级毛片毛片免费观看久潮,色图网免费视频在线观看十八禁,波多野结衣一二三

    phone/wechat/what's app: +86-18653810085

    Email: hongyuanmakela@163.com

    Taian Hongyuan Geosynthetics Co., Ltd.
    Tel:18653810085

    News Current Position:Home > News

    How to control the quality of geomembrane composite with non-woven?

    Release time:2020-4-7    This article is read :4127 Times

    geomembrane composite with non-woven

           How to control the quality of geomembrane composite with non-woven?.The quality of geomembrane composite with non-woven also needs to be controlled. As a professional geomembrane composite with non-woven manufacturer, Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the wholesale of geomembrane composite with non-woven for many years. The editor will take you to learn together.

           1. The geomembrane composite with non-woven with raw material quality control entering the site must have a certificate of conformity, performance and characteristic indicators and instructions for use provided by the manufacturer. Otherwise, it cannot be used for engineering construction. The two-fabric one-membrane needle-punched geomembrane composite with non-woven is used in this project. The technical parameters of the designed geomembrane composite with non-woven are: design weight 900g / m2, film thickness 0.5mm, vertical permeability coefficient ≤10-12cm / s. After the geomembrane composite with non-woven came into the field, the geomembrane composite with non-woven was randomly selected and its performance indexes were entrusted to the Nanjing Water Conservancy Research Institute Experimental Center for retesting, and the retesting results were all qualified.

           2. Control of the construction operation process Before the laying of the geomembrane composite with non-woven, the construction organization design should be compiled, the laying method and technical measures should be explained, and it should be used after being approved by the supervision. The construction personnel should wear flat-bottomed shoes or soft rubber-soled shoes. Step on the damaged geomembrane, so as to lay with the pressure, the laying of the geomembrane composite with non-woven should be coordinated with the laying of the protective layer. The quality of the geomembrane composite with non-woven welding seam in splicing is the key to splicing. In particular, the joint detection should be strengthened during construction. The detection method has a visual inspection method and two on-site leak detection. Visual method: After welding the geomembrane composite with non-woven, observe whether there is any missing joint, whether the joint is burnt, whether there is wrinkle, whether the splicing is even, etc. On-site leak detection adopts the inflation method to detect all the welds. The welds are double strips, with a cavity of about 10mm between the two. Seal both ends of the section to be tested, insert the gas needle, and inflate to 0.05mpa ~ 0.20 mpa, observe for 0.5min, observe the vacuum gauge, if there is no drop in air pressure, it shows no leakage, welding seam grid, otherwise you must find the cause and repair it in time. The anchoring of the upper and lower parts of the geomembrane composite with non-woven is an important link, and construction shall be carried out in strict accordance with the construction drawings and after acceptance by the supervisor.

           3. Quality inspection after construction. The quality inspection after construction is mainly a sampling test. A test piece is taken every 1000m2 for the tensile strength test. The strength should not be less than 80% of the base material, and the sample should not be broken at the joint, otherwise the joint quality will not be qualified. A total of about 45000m2 of geomembrane composite with non-woven was used in the whole project. A total of 43 sets of weld samples were taken on site for tensile strength test. The passing rate of the test was 100%, and the weld quality was qualified.

    How to control the quality of geomembrane composite with non-woven?
    Previous:How to deal with the boundary when laying the geomembrane composite with non-woven?next:Construction notes of GCL

    Contact Us:

    WeChat public account

    Taian Hongyuan Geosynthetics Co., Ltd.

    Phone / Wechat / What's app:+86-18653810085

    Telephone / Fax: + 86-538-6598877

    Email:  hongyuanmakela@163.com

    Website: www.taianhongyuan.com

    Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

    Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

    主站蜘蛛池模板: 亚洲综合天堂网| 精品国产一区91在线| 亚洲精品老司机| 欧类av怡春院| 亚洲国产欧美国产综合久久| 自拍中文字幕| 国产本道久久一区二区三区| 91伊人国产| 九九热精品视频在线| 蜜桃臀无码内射一区二区三区 | 第一页亚洲| 国内精品91| 黄色网在线| 精品国产香蕉伊思人在线| 青青草原国产免费av观看| 91九色最新地址| 婷婷综合亚洲| 日本国产精品| 毛片一区二区在线看| 国产网友愉拍精品视频| 中国毛片网| 免费亚洲成人| 美女视频黄又黄又免费高清| 精品国产免费观看| 色吊丝av中文字幕| 国产综合另类小说色区色噜噜| 亚洲AV无码不卡无码| 亚洲第一极品精品无码| 亚洲欧美日韩成人高清在线一区| 91精品小视频| 波多野结衣一区二区三区AV| 亚洲床戏一区| 久久综合色天堂av| 丁香五月婷婷激情基地| 91黄色在线观看| 91色老久久精品偷偷蜜臀| 呦女精品网站| 亚洲无码视频一区二区三区 | 热久久综合这里只有精品电影| 免费无码AV片在线观看中文| 一级毛片免费观看久| 久久精品这里只有精99品| 国产极品美女在线播放| 国产精彩视频在线观看| 亚洲天堂精品视频| 国产精品美女自慰喷水| 精品人妻一区二区三区蜜桃AⅤ | 22sihu国产精品视频影视资讯| www.99精品视频在线播放| 中文字幕人成人乱码亚洲电影| 国产成人免费| 亚洲精品福利视频| 亚洲综合二区| 99热这里只有免费国产精品 | 婷婷开心中文字幕| 国产免费精彩视频| 久久精品亚洲中文字幕乱码| 成人福利在线免费观看| 好久久免费视频高清| 国产精品美女网站| 999国内精品久久免费视频| 91亚洲影院| 亚洲三级影院| 日a本亚洲中文在线观看| 草逼视频国产| 国产极品粉嫩小泬免费看| 婷婷亚洲视频| 国产粉嫩粉嫩的18在线播放91| 色偷偷一区二区三区| a毛片在线| 国产剧情伊人| 在线国产综合一区二区三区| 91在线国内在线播放老师 | 狠狠亚洲五月天| 久久人与动人物A级毛片| 亚洲资源在线视频| 国产精品嫩草影院av| 丝袜久久剧情精品国产| 992tv国产人成在线观看| 国产毛片久久国产| 成人午夜久久| 国内自拍久第一页|