• <sup id="yyy8y"><cite id="yyy8y"></cite></sup>
    <tr id="yyy8y"></tr>
    
    
  • <nav id="yyy8y"><cite id="yyy8y"></cite></nav>
    <nav id="yyy8y"><cite id="yyy8y"></cite></nav>
    <small id="yyy8y"><menu id="yyy8y"></menu></small>
    在线国产欧美,婷婷色在线视频极品视觉盛宴,久久香蕉国产线看观看导航,国产激情婷婷丁香五月天,国产AⅤ天堂亚洲国产AV,a级毛片毛片免费观看久潮,色图网免费视频在线观看十八禁,波多野结衣一二三

    phone/wechat/what's app: +86-18653810085

    Email: hongyuanmakela@163.com

    Taian Hongyuan Geosynthetics Co., Ltd.
    Tel:18653810085

    News Current Position:Home > News

    How to control the quality of geomembrane composite with non-woven?

    Release time:2020-4-7    This article is read :4127 Times

    geomembrane composite with non-woven

           How to control the quality of geomembrane composite with non-woven?.The quality of geomembrane composite with non-woven also needs to be controlled. As a professional geomembrane composite with non-woven manufacturer, Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the wholesale of geomembrane composite with non-woven for many years. The editor will take you to learn together.

           1. The geomembrane composite with non-woven with raw material quality control entering the site must have a certificate of conformity, performance and characteristic indicators and instructions for use provided by the manufacturer. Otherwise, it cannot be used for engineering construction. The two-fabric one-membrane needle-punched geomembrane composite with non-woven is used in this project. The technical parameters of the designed geomembrane composite with non-woven are: design weight 900g / m2, film thickness 0.5mm, vertical permeability coefficient ≤10-12cm / s. After the geomembrane composite with non-woven came into the field, the geomembrane composite with non-woven was randomly selected and its performance indexes were entrusted to the Nanjing Water Conservancy Research Institute Experimental Center for retesting, and the retesting results were all qualified.

           2. Control of the construction operation process Before the laying of the geomembrane composite with non-woven, the construction organization design should be compiled, the laying method and technical measures should be explained, and it should be used after being approved by the supervision. The construction personnel should wear flat-bottomed shoes or soft rubber-soled shoes. Step on the damaged geomembrane, so as to lay with the pressure, the laying of the geomembrane composite with non-woven should be coordinated with the laying of the protective layer. The quality of the geomembrane composite with non-woven welding seam in splicing is the key to splicing. In particular, the joint detection should be strengthened during construction. The detection method has a visual inspection method and two on-site leak detection. Visual method: After welding the geomembrane composite with non-woven, observe whether there is any missing joint, whether the joint is burnt, whether there is wrinkle, whether the splicing is even, etc. On-site leak detection adopts the inflation method to detect all the welds. The welds are double strips, with a cavity of about 10mm between the two. Seal both ends of the section to be tested, insert the gas needle, and inflate to 0.05mpa ~ 0.20 mpa, observe for 0.5min, observe the vacuum gauge, if there is no drop in air pressure, it shows no leakage, welding seam grid, otherwise you must find the cause and repair it in time. The anchoring of the upper and lower parts of the geomembrane composite with non-woven is an important link, and construction shall be carried out in strict accordance with the construction drawings and after acceptance by the supervisor.

           3. Quality inspection after construction. The quality inspection after construction is mainly a sampling test. A test piece is taken every 1000m2 for the tensile strength test. The strength should not be less than 80% of the base material, and the sample should not be broken at the joint, otherwise the joint quality will not be qualified. A total of about 45000m2 of geomembrane composite with non-woven was used in the whole project. A total of 43 sets of weld samples were taken on site for tensile strength test. The passing rate of the test was 100%, and the weld quality was qualified.

    How to control the quality of geomembrane composite with non-woven?
    Previous:How to deal with the boundary when laying the geomembrane composite with non-woven?next:Construction notes of GCL

    Contact Us:

    WeChat public account

    Taian Hongyuan Geosynthetics Co., Ltd.

    Phone / Wechat / What's app:+86-18653810085

    Telephone / Fax: + 86-538-6598877

    Email:  hongyuanmakela@163.com

    Website: www.taianhongyuan.com

    Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

    Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

    主站蜘蛛池模板: 无套av在线| 久草中文网| 亚洲国产精品成人久久综合影院 | 欧美曰批视频免费播放免费| 免费一级α片在线观看| 一本色道久久88| 一本一本大道香蕉久在线播放| 3D动漫精品啪啪一区二区下载| 久久不卡国产精品无码| 呦视频在线一区二区三区| 91小视频版在线观看www| 国产丝袜精品| 亚洲动漫h| 国产精品无码制服丝袜| 97国产在线播放| 久久久久国色AV免费观看性色| 欧美、日韩、国产综合一区| 国产高清精品在线91| 伊人色在线视频| 成年午夜精品久久精品| 在线欧美一区| 国产专区综合另类日韩一区| 久久精品女人天堂aaa| 精品国产www| 高清免费毛片| 免费网站成人亚洲| 日本中文字幕久久网站| 午夜激情婷婷| 久热精品免费| 久久久久无码国产精品不卡| 久久精品国产精品国产一区| 亚洲天堂日本| 国产精品久久久久久影院| 国产玖玖玖精品视频| 99久久国产综合精品2020| 欧美成人午夜在线全部免费| 3344在线观看无码| 亚洲浓毛av| 韩国福利一区| 国产精品污污在线观看网站| 久久国语对白| 欧美亚洲一区二区三区导航| 亚洲AV一二三区无码AV蜜桃| 久久久精品久久久久三级| 亚洲一区毛片| 国产精品人成在线播放| 亚洲第一区在线| 蜜桃视频一区二区| 鲁鲁鲁爽爽爽在线视频观看| 国内丰满少妇猛烈精品播| 特级aaaaaaaaa毛片免费视频| 国产91成人| 99尹人香蕉国产免费天天拍| 欧美成一级| 国产aⅴ无码专区亚洲av综合网| 99热最新网址| 亚洲欧美另类色图| 国内精品久久九九国产精品| 午夜国产精品视频黄| 色播五月婷婷| 91视频99| 欧美www在线观看| 扒开粉嫩的小缝隙喷白浆视频| 97无码免费人妻超级碰碰碰| av手机版在线播放| 五月婷婷综合色| 波多野结衣一二三| 国产亚洲欧美日韩在线一区| 国产亚洲欧美日韩在线观看一区二区| 四虎影视8848永久精品| 大乳丰满人妻中文字幕日本| 国产毛片久久国产| 2021国产乱人伦在线播放| 久久国产高潮流白浆免费观看| 色婷婷在线播放| 91久久夜色精品| 国产真实乱人视频| 91青青草视频| 中文字幕一区二区视频| 欧美高清国产| 国产成人无码综合亚洲日韩不卡| 久久久久免费看成人影片 |